Ecommerce

Infiniti

Strategic meeting

08/03/2010

to present complete process

Photolink

Finalized design scheme

07/28/2010 - 07/30/2010

Final signoff from Croma

07/30/2010 - 08/02/2010

Work on wireframes

08/03/2010 - 08/06/2010

Tweaks in wireframe

08/06/2010 - 08/09/2010

Delivery of finalized wireframes

08/09/2010 - 08/13/2010

Croma signoff on wireframes

08/09/2010

Interface

Deliver final wireframes

08/16/2010

Discuss hangups with wireframes

08/16/2010 - 08/17/2010

Reports and additional alerts disc.

08/18/2010 - 08/20/2010

Interface, TCS

Blue Dart

Integration- Logistics

08/04/2010 - 08/10/2010

Blue Dart, TCS and Interface present

TCS

Woolworths

HDFC

PG integration

08/11/2010 - 08/13/2010

HDFC, Interface, TCS

Operations

Designated stores

08/02/2010

For pickup and drop of inventory.
Sumit, Hemant

Content

Specs

07/30/2010 - 08/31/2010

Site Content

08/09/2010 - 09/15/2010

Images

08/10/2010 - 08/31/2010

Item text

08/16/2010 - 09/08/2010

Reviews and faqs

08/22/2010 - 09/08/2010

Marketing

Packaging and labelling

07/30/2010

Branding and design of labels and packaging, options

HR

Training calendar: Define

08/04/2010 - 08/13/2010

Recruit Logistics personnel- Mumbai

08/04/2010 - 09/15/2010

Training Rollout

09/22/2010 - 09/30/2010