First stage of Graded unit, the planning stage is about reviewing the project brief, preparing a time line action plan for the tasks to be carried out, completing a log diary, preparing a 750 (min) word report for the client on the roles and responsibilities of the design team members and their significance in this project, there should also be a reference page, referencing all the information used in this stage.
12/27/2012 - 12/28/2012
% complete
12/29/2012 - 01/01/2013
% complete
Prepare Time line and update it during development and evaluation stages.
12/31/2012 - 01/01/2013
% complete
01/01/2013 - 01/02/2013
% complete
Complete A contents page for the whole project
01/02/2013 - 01/03/2013
% complete
01/09/2013 - 01/10/2013
% complete
01/15/2013 - 01/16/2013
% complete
01/16/2013 - 01/17/2013
% complete
01/20/2013 - 01/21/2013
% complete
01/23/2013 - 02/03/2013
% complete
01/23/2013 - 01/25/2013
% complete
Main part of project, required to carry out; two freehand sketched solutions, one solution to be developed into formal sketch, then the formal sketch to be developed into a scaled CAD drawing, protection of existing underground services to be described and detailed, list of materials used along with specifications and relevant standards, heat loss calculation and a list of the advantages of proposed design solution recommended to the client. Setting out plan and accuracy statement is also to be prepared in this stage.
02/05/2013 - 04/18/2013
% complete
Continuously apply details such as header and footers and page numbers to documents and work.
02/05/2013 - 02/06/2013
% complete
Brief intro to second stage of project
02/05/2013 - 02/12/2013
% complete
Prepare freehand sketches of two possible design solutions
02/07/2013 - 02/08/2013
% complete
02/08/2013 - 04/25/2013
% complete
Continue to add to the reference page throughout the development stage of the project
02/13/2013 - 02/17/2013
% complete
One design solution to be developed into a formal annotated sketch,
02/18/2013 - 03/06/2013
% complete
the chosen solution is to be developed into a scaled working drawing or CAD generated drawing comprising plans, cross section and elevations
02/26/2013 - 02/28/2013
% complete
Discribe in detail the protection of existing underground services
03/02/2013 - 03/04/2013
% complete
Provision of a list of materials used in construction of the extension, with performance specifications and relevant standards.
03/06/2013 - 03/13/2013
% complete
Complete a heat loss calculations through an external wall using u-value
03/13/2013 - 03/16/2013
% complete
Complete a calculation of the total estimated cost of the project.
03/27/2013 - 03/31/2013
% complete
Create a list of the advantages of the proposed design solution recommended to the client.
04/01/2013 - 04/08/2013
% complete
To appreciate the scale of the proposed extension, a setting out plan is required
04/03/2013 - 04/07/2013
% complete
To appreciate the scale of the proposed extension, an accuracy statement is required
The reflection and evaluation stage of the project, comprising of an explanation of the compliance of the proposed design with the current building regulations, including comments on sustainability, an evaluation report of there performances in achieving the brief and also the lessons learned in a report, a completed log diary as evidence of activity through all three stages, and a report indicating my CPC might be developed in the light of my project performance.
04/01/2013 - 05/13/2013
% complete
Make sure high standard is demonstrated in submission of work
04/26/2013 - 05/03/2013
% complete
Create an explanation of the compliance of proposed design with the current building regulations (Scotland) including comments on sustainability aspects.
04/28/2013 - 05/05/2013
% complete
Create a performance evaluation report in achieving the brief and the lessons learned, include intro, main structure to the report, appropriate conclusion (in total 500words)
04/30/2013 - 05/02/2013
% complete
05/01/2013 - 05/12/2013
% complete
Indicate how CPD might develop in light of project performance
05/30/2013 - 05/31/2013
% complete