Ecotectures lead in to project start.
Estimate period for design stage.
Typically feedback occurs during the design stage and towards the end.
Digitising scheme design ready for submission.
Planning Submission and Registration
Determination period with Local Council
Production of Building Regulation Information by structural engineer and Ecotecture
Negotiation between Contractor Client and Architect
This is a typical lead in time we have provided for estimation purposes
Ground works super structure and weather proofing of extension including additional services if required
Knocking through into the existing ground and first floor Insulation to loft New velux or sunpipes and new internal finishes