Hovercraft

Meetings&Deadlines

Early Design Development

04/02/2013 - 04/05/2013

Forming team, Researching on the design.

Materials Costing Research

04/04/2013 - 04/11/2013

Fatin & Foo
Find out the cost of major component required.

Engine Design

04/04/2013 - 04/11/2013

Michael & Kamal
Designs for the engine.
Fans and flows

Design of Hovercraft

04/04/2013 - 04/11/2013

Saleh
Rough draft & drawings of early hovercraft design.

Meeting for 1st CheckUp

04/04/2013

Analyze orders and steps to build hovercraft.
List down all factors affecting the design.
Determine major materials and components.
Splitting task to each members.

Bi-weekly Meeting

04/11/2013

Listing out materials involved.
Body Design
Efficiency Research

Proposal

04/11/2013 - 04/18/2013

Foo & Kamal
Works out on proposal of the design.

Costing of Materials

04/11/2013 - 04/18/2013

Fatin & Michael
Surveying in market for the materials needed with decent price.

Q & A

04/11/2013 - 04/18/2013

Questions and Answers

Propulsion System Research

04/11/2013 - 04/18/2013

Saleh
Finding the best type of propeller for the hovercraft.

Bi-Weekly Meeting

04/18/2013

Buying Materials

04/18/2013 - 04/25/2013

Buying materials and components

Bi-Weekly Meeting

04/25/2013

Building Base

04/25/2013 - 05/06/2013

Start Building & Shaping Hover Base

Assembling Hovercraft

04/25/2013 - 05/20/2013

All Components are assembled together.
Tasks will be given to each members and assemble differently by different person according to each members skills and major.

Progress Check

05/02/2013

Bi-Weekly Meeting

05/02/2013

Building Skirt

05/02/2013 - 05/13/2013

Progress Check 2

05/09/2013

Bi-Weekly Meeting

05/09/2013

Attaching Skirt to Base

05/13/2013 - 05/20/2013

Progress Check 3

05/16/2013

Test Drive 1

05/16/2013 - 05/23/2013

Fully Assembled Hovercraft is tested to identify any weaknesses

Maintenance

05/23/2013 - 05/30/2013

Enhancing & Improving

05/30/2013 - 06/13/2013

Final Preparation

06/01/2013 - 06/30/2013

Test Drive 2

06/13/2013 - 06/20/2013

Maintenance

06/20/2013 - 06/27/2013

Decorating

07/01/2013 - 07/03/2013

Race Day

07/04/2013

Let the race begins!