PBR Timeline

Phase 1

Geotechnics

02/20/2013 - 02/25/2013

Site Investigation

Environmental

02/23/2013 - 02/27/2013

Habitat Location
EIR and EA

Structures

02/24/2013 - 02/27/2013

Seismic Report

Transportation

02/26/2013 - 03/02/2013

Pavement Design
Geometric Calculations
Land Survey

Water Resources

02/28/2013 - 03/02/2013

Hydraulic Analysis

Phase 2

Environmental

03/04/2013 - 04/02/2013

Mitigation Alternatives

Transportation

03/05/2013 - 03/28/2013

Alignment Alternatives

Phase 3

Structures

03/28/2013 - 04/08/2013

Bridge Design

Geotechnics

04/06/2013 - 04/14/2013

Retaining Wall Design
Slope Stability Analysis

Phase 4

Geotechnics

04/08/2013 - 04/28/2013

Foundation and Abutment Design

Transportation

04/17/2013 - 05/01/2013

Redo Alignments
Corridor Analysis
Earthwork Calculations

Water Resources

04/24/2013 - 04/29/2013

Runoff Analysis

Phase 5

Construction

05/06/2013 - 06/07/2013