Beeswax - Technical Overview preparation plan

Events

Introduction

12/22/2014

Technical meeting between Sigma Software and Beeswax teams. Exploration of existing documentation.

Environment setup

12/23/2014 - 12/24/2014

Sigma Software team will gain existing code from Beeswax, investigate it to get overall idea of technical approaches and current state of the project and will set up stage environment on Sigma Software's side.

Technical vision (draft)

12/25/2014 - 12/26/2014

Sigma Software will prepare a draft Technical Design and send it over to review. It is important to start from this core part of the document and make sure both teams are on the same page. We may need some consultation from Beeswax team at this point.

Technical vision (review)

12/29/2014 - 12/30/2014

At this point we will ask Beeswax team to review first version of technical vision to get their early feedback.

Overview created

12/31/2014 - 01/02/2015

Sigma Software prepares Overview, Background and Objective parts of the document.

Technical design

01/05/2015 - 01/07/2015

Comments received from Beeswax team are addressed. Detailed technical design is prepared and sent for review.