Mount Rushmore National Memorial is a monumental sculpture carved into the Black Hills of South Dakota, featuring the 60-foot faces of Presidents George Washington, Thomas Jefferson, Theodore Roosevelt, and Abraham Lincoln. Sculpted by Gutzon Borglum and later his son Lincoln Borglum, the project began in 1927 and was completed in 1941, becoming one of America's most visited landmarks. More Less
1800 - 1850
% complete
By 1800 those groups were supplanted by the Cheyenne, Arapaho, and Lakota Sioux, with the Lakota becoming the majority in the area by 1850.
Image source: Mount Rushmore
1851 - 1868
% complete
The United States government recognized the Black Hills as the exclusive territory of the Lakota in both the First and Second Treaty of Fort Laramie (1851 and 1868, respectively), creating the Great Sioux Reservation in which the Black Hills were situated.
Image source: Treaty of Fort Laramie (1868)
1873
% complete
The name referred to the six head-like knobs along the summit ridge, which came to be associated with Black Elk's 1873 "Great Vision" of the Six Grandfathers.
Image source: Black Elk
1874
% complete
General George Armstrong Custer summited Black Elk Peak in 1874 during the Black Hills Expedition, which triggered the Black Hills Gold Rush and Great Sioux War of 1876. The Treaty of Fort Laramie (1868) had granted the Black Hills to the Lakota in perpetuity, but the United States took the area from the tribe after the war.
1884 - 1885
% complete
Rushmore visited the area on three or four trips over the span of 1884 and 1885, giving the mountain its name.
Jun 1, 1930
% complete
The name "Mount Rushmore" continued to be used locally, and was officially recognized by the United States Board of Geographic Names in June 1930.
Image source: United States Board on Geographic Names
1923
% complete
In 1923, Doane Robinson, Secretary of the South Dakota State Historical Society and later known as the "Father of Mount Rushmore", sought to boost tourism to South Dakota through the construction of a large monument in the Black Hills.
Image source: Doane Robinson
Aug 20, 1924
% complete
In 1924, Robinson read about the Confederate memorial at Stone Mountain, Georgia, underway since 1915. On August 20, 1924, he wrote to Gutzon Borglum, the sculptor of the Stone Mountain memorial, asking him to travel to the Black Hills region to determine whether the carving could be accomplished.
Image source: Gutzon Borglum
Sep 24, 1924
% complete
Borglum had been having disagreements with the Stone Mountain Memorial Association, and on September 24, 1924, travelled to South Dakota to meet Robinson. In a 1924 letter, he described the South Dakota memorial as "not unrelated to the Memorial to the great Confederates" and as "a great Northern National Memorial" equal in proportions to the Southern Memorial.
Jan 1, 1925 - Dec 31, 1925
% complete
Senator Peter Norbeck, who had established Custer State Park when he was Governor in 1919, and Congressman William Williamson of South Dakota introduced bills in early 1925 for permission to use federal land, which passed easily.
Image source: Peter Norbeck
Jan 1, 1925 - Dec 31, 1925
% complete
Through 1924, predominant opinion in South Dakota was either opposed or indifferent to the memorial project, and it was only through considerable lobbying on the part of Robinson and Borglum that the project began to gain support in early 1925.
Mar 5, 1925
% complete
South Dakota legislation had less support than federal bills, only passing narrowly on its third attempt, which Governor Gunderson signed into law on March 5, 1925.
Aug 1, 1925
% complete
The press reported a March 7, 1925 conference between Norbeck and Borglum mentioning the Washington-Lincoln design and use of Mount Harney (now Black Elk Peak). The Needles were later found too small and unstable for carving at scale. In August 1925, Borglum set out on an expedition near Harney Peak to scout a final location for the monument.
Image source: Black Elk Peak
Aug 10, 1927 - Oct 4, 1927
% complete
The dedication ceremony was held on August 10, 1927, and carving of the sculpture got underway on October 4. Gutzon Borglum named it the Shrine of Democracy and oversaw execution with help from his son, Lincoln Borglum.
Feb 25, 1929
% complete
The Mount Rushmore National Memorial Act, which authorized up to $250,000 in matching funds, was introduced to Congress in 1928 and signed into law by Coolidge on February 25, 1929, just before leaving office. The 1929 presidential transition to Herbert Hoover delayed funding until an initial federal match of $54,670.56 was acquired.
Image source: Calvin Coolidge
1933
% complete
In 1933, the National Park Service took Mount Rushmore under its jurisdiction.
Image source: National Park Service
1934
% complete
A 500-word essay giving the history of the United States by Nebraska student William Andrew Burkett was selected as the winner in the college-age group in a 1934 competition, and that essay was placed on the Entablature on a bronze plate in 1973.
1939
% complete
Workers only managed to cut about 70 feet into the rock before work stopped in 1939 to focus on the heads. No further work on the Hall of Records was carried out after completion of the statues in 1941.
Mar 1, 1941
% complete
After Gutzon Borglum died from an embolism in March 1941, his son Lincoln took over as leader of the construction project.
Jul 4, 1934
% complete
By July 4, 1934, Washington's face had been completed and was dedicated. Construction began in 1927 and the presidents' faces were completed between 1934 and 1939.
Image source: George Washington
1936
% complete
The face of Thomas Jefferson was dedicated in 1936. That same year, Black Elk visited the site while it was still under construction.
Image source: Thomas Jefferson
1937
% complete
In 1937, when the sculpture was not yet complete, a bill was introduced in Congress supporting the addition of women's rights activist Susan B. Anthony's head to the monument.
Image source: Susan B. Anthony
Sep 17, 1937
% complete
1939
% complete
In 1939, the face of Theodore Roosevelt was dedicated. The Sculptor's Studio – a display of unique plaster models and tools related to the sculpting – was built in 1939 under the direction of Borglum. It was his second on-site studio and was kept intact after the 1941 opening of the memorial.
Image source: Theodore Roosevelt
Oct 31, 1941
% complete
Each president was originally to be depicted from head to waist, but lack of funding forced construction to end on October 31, 1941, and only Washington's sculpture includes any detail below chin level. Between October 4, 1927, and October 31, 1941, Borglum and 400 workers sculpted the colossal 60-foot-high carvings of Washington, Jefferson, Theodore Roosevelt, and Lincoln representing the first 150 years of American history. When the sculpture was completed, the sculptors said the remaining rock was not suitable for additional carvings. The entire project cost US$989,992.32 (equivalent to $21.7 million in 2025).
1940
% complete
Construction on the Crazy Horse Memorial began in 1940 elsewhere in the Black Hills.
Image source: Crazy Horse Memorial
1940 - 1949
% complete
Noted climbers Jan and Herb Conn pioneered many climbing routes in this area in the 1940s and eventually came to make their home in the Black Hills in 1949.
Image source: Black Hills
1957
% complete
Harold Spitznagel and Cecil Doty designed the original visitor center, finished in 1957, as part of the Mission 66 effort to improve visitor facilities at national parks and monuments across the country.
Image source: Mission 66
Oct 15, 1966
% complete
On October 15, 1966, Mount Rushmore was listed on the National Register of Historic Places.
Image source: National Register of Historic Places
1971
% complete
Members of the American Indian Movement led an occupation of the monument in 1971, naming it "Mount Crazy Horse", and Lakota holy man John Fire Lame Deer planted a prayer staff on top of the mountain.
Image source: American Indian Movement
1973
% complete
The winning 1934 essay by William Andrew Burkett was placed on the Entablature on a bronze plate in 1973.
1976
% complete
The walkway was added during the 1976 United States Bicentennial and is lined with the flags of all 50 current states, as well as the District of Columbia, three territories, and two commonwealths, arranged in alphabetical order.
Image source: Avenue of Flags
1988 - 1998
% complete
Ten years of redevelopment work culminated with the completion of extensive visitor facilities and sidewalks in 1998, such as a visitor center, the Lincoln Borglum Museum, and the Presidential Trail. The Grand View Terrace and amphitheater were added in 1998, offering a prime vantage point for the sculptures.
Image source: Lincoln Borglum Museum
1998
% complete
In 1998, a stone time capsule was constructed inside the mouth of the cave housing 16 enamel panels with biographical and historical information about Mount Rushmore, as well as the texts of the documents Borglum wanted to preserve there.
1998
% complete
In 1998, electronic monitoring devices were installed to track movement in the topology of the sculpture to an accuracy of 0.12 inches (3 mm). RESPEC, an engineering firm charged with monitoring the stability of the rock in 1989, shared the view that remaining rock was unsuitable for additional carvings.
2004
% complete
In 2004, Gerard Baker was appointed superintendent of the park, the first and so far only Native American in that role.
Image source: Gerard Baker (National Park Service)
2005
% complete
In 2005 Alfred Kärcher, a German manufacturer of pressure washing and steam cleaning machines, conducted a free cleanup operation which lasted several weeks, using pressurized water at over 200 °F (93 °C).
Image source: Kärcher
2009
% complete
The site was digitally recorded in 2009 using a terrestrial laser scanning method as part of the international Scottish Ten project, providing a high-resolution record to aid the conservation of the site.
Jul 8, 2009
% complete
On July 8, 2009, a group of Greenpeace protesters scaled Mount Rushmore, hanging a 65-foot-by-35-foot banner next to former U.S. presidents' faces.
Image source: Greenpeace
2016
% complete
A 2016 investigation found the probable cause of water contamination was aerial fireworks displays held on Independence Days from 1998 to 2009; the National Park Service also reported at least 27 forest fires around Mount Rushmore in that period caused by fireworks. A 2007 study had found almost two-thirds of the park's acreage consisted of old-growth ponderosa pine forest, and a 2010 article noted fire suppression had left forests overgrown with fuel. An environmental impact assessment issued in 2020 left room for possibly returning fireworks.
Nov 1, 2019
% complete
Nick Clifford, the last remaining carver, died in November 2019 at age 98.
Aug 11, 1952
% complete
On August 11, 1952, the U.S. Post Office issued a stamp depicting the monument. On January 2, 1974, a 26-cent airmail stamp depicting the monument was also issued.
1991
% complete
In 1991 the United States Mint released commemorative silver dollar, half-dollar, and five-dollar coins celebrating the 50th anniversary of the monument's dedication, and President George H. W. Bush rededicated the monument. The sculpture was also the main subject of the 2006 South Dakota state quarter.
2017 - 2018
% complete
During a 2017 rally in Ohio, Trump joked about whether he might one day be on Mount Rushmore. South Dakota Governor Kristi Noem described the potential addition as Trump's "dream" in 2018. Barack Obama had been asked about his own potential addition in 2008 and joked that his ears were too large; proposals had also been made for John F. Kennedy after his 1963 assassination and Ronald Reagan in 1985 and 1999, the latter receiving a debate in Congress.
Jan 28, 2025
% complete
On January 28, 2025, a Representative introduced legislation regarding adding Donald Trump's likeness to Mount Rushmore.
Or browse the full history timeline directory, with more than 2,000 topics.
This Mount Rushmore timeline was generated with the help of AI, using information found on the internet.
We work hard to keep these timelines accurate, but mistakes do get through. If you spot one, email us at [email protected] and we'll fix it for future visitors.
Generate yours with AI, or build it from scratch.
Export your timeline, add your own events, edit or remove AI-generated events, and much more
No credit card required.
Cancel anytime.
Cancel anytime.
You can create an unlimited number of timelines with up to 10 events on each one, customize how they look, export them to PDF, PNG, PowerPoint, CSV, and Excel, and share them with a link. Paid plans raise the event limit and add features like spreadsheet imports and collaborators.
Yes. You can cancel your subscription from your account page at any time, and you will not be charged again. Your subscription stays active for the rest of the period you already paid for.
Yes. We will email you a reminder before the annual renewal, and we will also email you a receipt.
Yes. You can email us within 15 days of any payment, and we will issue you a full refund.
Check out our pricing docs or send us an email anytime: [email protected].